Energized, grid-connected infrastructure sites ready for immediate deployment. Each listing has been vetted for power reliability, connectivity, and proximity to critical supply corridors.
40 Acres • 25MW Available Now • Natural Gas Pipeline • Fiber Connectivity • Water Access • 90 Minutes from Houston
| Infrastructure Asset | Details |
|---|---|
| Site Size | 40 Acres |
| Available Capacity | 25 MW immediately available |
| Grid Status | Energized and operational |
| Natural Gas Infrastructure | Natural gas pipeline available on or near the site |
| Connectivity | Fiber internet access |
| Water Access | Available on-site |
| Location | Approximately 90 minutes from Houston |
| Use Cases | AI Data Centers, HPC, Cloud Infrastructure, Digital Asset Computing |
| Deployment Timeline | Accelerated compared to greenfield developments |